Getlinkgroup.com

The Channel Tunnel - Eurotunnel

The Channel Tunnel - Eurotunnel

The Channel Tunnel is the only way to cross the English Channel, with a 38km undersea section. It has three tunnels, two for trains and one for service.

Domein: getlinkgroup.com Bekijk meer

Rolling stock - Eurotunnel

Rolling stock - Eurotunnel

Eurotunnel uses 57 electric locomotives, 9 passenger shuttles (24 carriages) and 15 truck shuttles (32/31 carrier wagons). Each shuttle has two locomotives.

Domein: getlinkgroup.com Bekijk meer

Eurotunnel, a key player in low-carbon transport

Eurotunnel, a key player in low-carbon transport

Eurotunnel operates the Channel Tunnel since 1994, carrying nearly 10 million passengers and over one million freight trucks annually, providing a permanent ...

Domein: getlinkgroup.com Bekijk meer